You can work from home during a remodel, and you are not going to enjoy every day of it. Construction is loud at essentially every stage, including the stages people assume are quiet. What makes it survivable is distance from the work, a schedule we know about in advance, and a realistic idea of what a contractor can and cannot turn down for you. Here is the whole picture before you commit to it.

Every phase makes noise, including the ones you would not expect
Homeowners usually brace for demo and assume the rest is quiet. Practically everything in construction makes noise.
Demo is saws, hammers, trash cans being wheeled in and out, and the sound of material landing in a dumpster. Framing is saws and hammers again, plus nail guns going off inside your house. Drywall brings screw guns driving hundreds of screws, and then the scrape of tools running across the seams for days.
Finish carpentry puts the nail guns back in play. Even paint, which sounds like the quiet one, means plastic crinkling constantly in the background and a sprayer motor kicking on and off all day.
So set your expectation accordingly. There will be noise of varying kinds from the first morning through to close to the last, rather than one loud week and then peace.
Which parts are worst, and roughly how long they last
The loud work is front loaded on most projects, which is the one piece of good news in here.
Demo and framing sit at the start and they are the two worst stretches. Framing on a basement often runs four or five days, sometimes faster, so the period where nail guns are going constantly is usually measured in a business week rather than a month. Demo is shorter still on most scopes.
Drywall is the long one. It is less violent than framing and it goes on considerably longer, because taping and sanding a space takes days of steady, repetitive noise rather than bursts. Paint and finish carpentry come last and they are the quietest part of a loud process, which is not the same as quiet.
So if your worst weeks for calls are known in advance, the useful question is which phase they collide with. Three days of framing can sometimes be moved. Two weeks of drywall cannot be.
Distance is the only fix that really works
The best advice I give clients who work from home is simple. Get as far from the work as you can.
A basement finish with your office upstairs works well, because a floor between you and the saws does more than anything else available. The same goes for a main floor remodel if you can set up in a finished basement, or a primary bathroom job if your desk is at the other end of the house.
Where it gets hard is a project in the room next to where you work, or a whole house remodel where there is nowhere to retreat to. That is a genuine problem and I am not going to pretend otherwise.
What we can plan around
If your calls land on a regular schedule, tell me at the walkthrough and we will try to work around them.
Standing meetings on set days, a recurring afternoon block, a weekly client call. Those are plannable, because the trade schedule gets built a week or more ahead and loud tasks can often be placed where they do the least damage. Quiet work exists in most phases and some of it can be moved to the hours you need.
What makes it work is knowing in advance. A schedule I have on day one shapes the whole job. A schedule I learn about in week four cannot undo the plan already running.
The request that does not work
Here is the part worth being straight about, because it causes more friction than anything else on this list.
Calling me every few hours to ask the trades to go quiet for fifteen minutes is not something I can deliver. One time, on a day that happens to allow it, maybe. I have had clients ask for an hour of silence at one o’clock. Done once as a favor, that is fine. Done repeatedly, it is not practical and it is not professional to ask subcontractors who are being paid to produce to sit on their hands.
Every pause costs somebody money and pushes your own finish date out. Enough of them and you have traded weeks of your schedule for quiet afternoons.
So if you need absolute quiet all day, every day, construction is not going to be a good fit for you, and I would rather say that before a contract than discover it in month two. Construction is loud. It has to get loud before it can get quiet.
What I will actually promise
I will accommodate as much as the schedule allows, and sometimes it is going to be impossible.
That is the whole of it. I would rather give you a limited promise I can keep than a generous one that falls apart in week two, because the second kind is how a good project turns into a bad relationship. If a specific day genuinely matters to you, tell me which day and I will tell you straight away whether it can be worked around or not.
What I will not do is agree to something at the estimate to win the job and then quietly fail at it once the trades are booked.
Hours, and what the neighbors hear
Working hours get agreed with the homeowner before anything starts. On most jobs that lands somewhere around eight in the morning to five or six in the evening.
Those hours are the real mitigation, because they keep everything inside the part of the day when a neighborhood expects activity. If you need a later start or an earlier finish, that is a conversation worth having up front rather than after the schedule is set.
For the neighbors there is very little a contractor can do, because the work is happening inside a house and the walls are where they are. The loudest thing anybody next door actually hears is material going into the dumpster, and that is a handful of moments across a day rather than a constant.
What to think about before you sign
Ask where the work sits relative to where you work, and be specific about it. Same floor, same wall, or two floors away changes the answer completely.
Ask whether the project has a phase structure that puts the loudest work early, which most do, so you know whether the worst of it is the first three weeks or spread across three months. Then be straight with yourself about whether you can take calls through it, because a rental office for six weeks is cheaper than a project you fight with daily.
The same question sits underneath our piece on whether you can live in your house during a remodel, which covers the stay or go decision in full. For what else the house is dealing with while you work, how much dust a remodel actually makes is the companion to this one. If you are planning around a kitchen specifically, how long you will be without a kitchen has the real downtime windows. To talk through a project in Logan, North Logan, Providence or anywhere in Cache Valley, request an estimate.