Do You Need to Be Home While Your Remodel Is Happening?

No, you do not need to be home while your remodel is happening, and most of our clients are not. What you do need is a way for the right people to get in, an understanding of who those people are, and enough communication that an empty house never feels like a black box. Here is how that works on a Salt to Summit project, including the part where I hand somebody a code to your house.

White kitchen with a quartz island opening onto a hallway and door, used to illustrate access to a house while a remodel is underway.

You do not need to be there

Plenty of homeowners assume they are expected to take time off, or to be sitting in the next room for eight weeks. You are not.

Most of our projects run with the clients at work, at school runs, or out of town entirely. A remodel that only moves when the owner is available is a remodel that takes twice as long, and nobody benefits from that. If being present matters to you for your own reasons, that is completely fine and we work around it. It is a preference rather than a requirement.

And we will never tell you to leave

The reverse question comes up just as often. Am I allowed to be here while you work?

Yes. I will never tell a family they cannot be in their own house, and I have never needed to. People are better at judging this than they get credit for. Homeowners generally know without being told when they should stay out of a room, and the ones who want to watch demo from a safe distance are welcome to.

The precautions we carry are enough that you can usually live in half a house while the other half is being renovated. Where it gets harder is a project that takes the whole house at once, and that is a different conversation we would rather have before the contract than during month two.

How we get in, and why we want two ways

Whatever you are comfortable with. Clients have used a lockbox, a key left somewhere agreed, a door code, a garage code. There is no single right answer and we do not push one.

What we do recommend is a backup. Two ways in, so that a dead keypad battery or a lock that decides to stick does not cost everybody a morning. We are on a job right now running a garage code plus a key, and that is a good shape for it. One method fails at some point on most long projects, and the second one turns a lost day into a five minute problem.

We lock up on the way out. Every time, whoever was last in the house. That sounds obvious written down and it is the kind of obvious thing that goes wrong on jobs where nobody made it anybody’s responsibility.

I am there the first day every new sub starts

This is the part I would want to know about if it were my house.

When a subcontractor starts a stretch of work on your project, I am on site the morning they first show up. I am the one who lets them in. I walk them through the space, show them what they need to know about the house, point out what is staying and what is not, and make sure they understand where they are working and where they are not. If a plumber has three days on your job, I am there for the start of day one.

After that they have the access method and they get on with it. The first morning is the one that sets the standard for how somebody treats a house, and it is worth my time to be standing in it.

You also know who is coming and when. That is a basic courtesy and it is not hard to provide.

Your hours, not the trades’ hours

Start and finish times on our jobs are set by the client.

Some subcontractors like to be swinging a hammer at eight sharp. Others prefer to roll in around ten or ten thirty. Personally I do not care which, as long as we are making good progress in good time, and that means the homeowner gets to decide instead.

The range of what people actually ask for is wider than you would think. One client told us we could start at five in the morning if we wanted. Another could not have anybody in the house before nine. Both were easy to work with, because both told us up front. Same with end times. If you have a baby who naps at one, or you take calls from home in the afternoon, say so during the walkthrough and it gets built into the schedule rather than negotiated every week.

How many people are actually in your house

On a mid sized job, expect around two scopes of work in a given week on average. That average hides a lot of variation.

A drywall stretch might be one trade for two straight weeks. A week like the one we are in right now on another project runs demo, then framing, then rough plumbing, then rough electrical, which is four different outfits through the house in five days. Neither is a problem. It does mean that if you want to know who is going to be there on a particular day, the answer changes week to week and you should ask rather than assume.

How somebody earns a code to your house

Every trade on our jobs is a subcontractor, which makes the selection process the thing that protects you.

The first layer is legality, and it is not negotiable. Licensed. Insured. Full documentation in my hands before they set foot on a job, including a W-9 and either workers compensation or a valid waiver. No paperwork, no work.

Beyond that I generally only bring on trades with a real web presence, because it lets me check how long they have been operating and what they have been doing. We are deliberately exclusive about who we work with. That is a business decision first and it happens to be the thing that most eases a homeowner’s mind, because the person walking into your kitchen is not somebody I found this morning.

On top of that sit the preferred trade partners, which is where most of the work actually goes. My plumber has been on every job since the beginning. Vouching for somebody who has been in dozens of houses with you is a different conversation from vouching for a stranger.

How often you hear from us

As often as the job requires. Some days that is several messages. Some weeks it is a check in every couple of days because nothing has changed and saying so is still worth doing.

The standard I hold is that you should know what is happening in your house at all times, whether you are standing in it or four hundred miles away. An empty house is only unnerving when nobody is telling you anything about it.

What to ask before you hand over a code

Ask who will be in the house and when, and ask whether the general contractor is present when a new trade starts.

Ask what documentation they hold on their subcontractors and whether they will show it to you. Ask what the access plan is if the primary method fails. A contractor who has thought about your house answers all of that without pausing.

For more on what a general contractor is actually doing while you are at work, read what does a general contractor actually do. If you are still deciding who to hire, what to look for in a general contractor in Northern Utah covers the vetting questions worth asking. When you want to talk about a project in Logan, North Logan, Hyde Park or anywhere in Cache Valley, request an estimate.

Common Questions

Do I have to take time off work during my remodel?

No. Most of our projects run with the clients at work or out of town entirely. A remodel that only moves when the homeowner is available takes far longer than it needs to. Being present is a preference we work around rather than a requirement.

How does a contractor get into my house while I am out?

Whatever you are comfortable with. Clients use a lockbox, a key left somewhere agreed, a door code or a garage code. We recommend setting up two ways in, because a dead keypad battery or a sticking lock will otherwise cost everybody a morning at some point during a long project.

Who is actually in my house during a remodel?

On a mid sized job it averages around two scopes of work per week, though that swings widely. A drywall stretch can be one trade for two straight weeks, while a rough in week can bring demo, framing, plumbing and electrical through in five days. Ask your contractor week to week rather than assuming a fixed answer.

How do I know the subcontractors are trustworthy?

Ask what documentation the general contractor holds on them. On our jobs a trade does not set foot on site without being licensed and insured, with a W-9 and either workers compensation or a valid waiver on file. I am also personally on site the first morning a new subcontractor starts, to let them in and walk them through the house.

Can I set the working hours in my own house?

Yes, and you should. Start and finish times on our jobs are set by the client rather than the trade. We have had clients tell us five in the morning was fine and others who could not have anybody in before nine. Both work, as long as it is agreed at the walkthrough instead of renegotiated weekly.