The outside of your house takes less damage from a remodel than most people expect, and the parts that do get affected are predictable enough to plan for. A dumpster sits somewhere for about a month. Material lands in the driveway for a few days at a time. Your landscaping usually never gets touched at all, unless the project is an addition. Here is what actually happens out there, including the two times a driveway came off worse for it.

Where the dumpster goes
On the street or in the driveway, whichever is convenient and whichever the truck can actually reach.
That second part decides it more often than preference does. A dumpster has to be dropped and collected by a roll off truck, which needs a straight approach and clearance, so a tight driveway or a low branch can make the street the only real option. If you have a preference, say it early and we will work to it where the access allows.
I order the dumpster rather than leaving it to you, and that is worth knowing because it means the cost and the timing sit with us rather than turning into something you have to chase.
Why it is rented by the month
I order in one month increments, because that is where the value is. Shorter rentals cost more per day and most remodels run at least a month anyway, so the math lands in the same place.
A month also happens to cover the phases that generate almost all of the waste. Demo produces the bulk of it, then framing offcuts, then drywall scrap, then tile and backer board. Finish carpentry adds a little at the end. Line those up and the heavy waste window and the rental window are close to the same thing.
If a project runs longer, the dumpster gets swapped or extended. It does not sit full for three weeks waiting on somebody, which is the failure mode worth asking about if you are comparing contractors.
Yes, a dumpster can mark your driveway
I would like to tell you this never happens. It has happened twice and both are worth describing, because what matters is what gets done about it.
The first was rust. A dumpster sat on a driveway long enough to leave rust marks where the steel met the concrete. We brought in a pressure washer and got it roughly ninety percent of the way back. The remainder fades with time. It was never going to come back to exactly what it was and I am not going to claim otherwise.
The second was oil. The truck delivering a dumpster was leaking and left it on the driveway. Same response, somebody came out and pressure washed it with a detergent, and again it came back close rather than perfect.
Neither of those cost the homeowner anything, which is the part that actually matters. If something happens to your driveway because of equipment that is here for my project, dealing with it is my problem. The question worth asking any contractor is not whether marks can happen, because they can. Ask who pays to clean it up.
Where material sits, and for how long
Material gets dropped on the street or in the driveway, and it does not sit as long as people imagine.
A week or two is the absolute maximum, and the typical case is much shorter. Framing on a basement often takes four or five days, so a lumber delivery might only be outside for a single business week before it is all inside the house and fastened to something. Drywall, tile and cabinets follow the same pattern, arriving close to when the trade that installs them shows up.
What stops material sitting around is ordering it against the schedule instead of all at once at the start. If a bid has everything landing on day one, your driveway is a storage yard for two months and the material is exposed to weather for no reason.
Most of the time your yard is not involved
For interior work, which is most of what we do, we are not dealing with landscaping at all. Nothing gets dug, nothing gets driven over, and the yard is exactly as you left it.
The traffic is people walking from a vehicle to a door, which is the same traffic your house gets anyway. The dumpster and the material are the only things occupying space outside, and both of those sit on hard surfaces.
So on a basement finish, a kitchen, or a bathroom, the yard question mostly answers itself.
Additions and ADUs are the exception
This is where the yard becomes a real part of the conversation, and it gets handled before anybody signs.
An addition or an accessory dwelling unit means excavation, footings, concrete trucks and material staged across ground rather than pavement. The yard around that work is going to be torn up. There is no version where it is not.
The question we settle at the estimate is whether putting the yard back together is in the scope or not. Either we add it to the quote and it is our responsibility, or it stays with you and you have somebody lined up for it. Both are fine. What is not fine is leaving it undecided until the work is done and then discovering two different assumptions.
The expectation I set with anybody doing an addition is that it is going to look like Armageddon out there before it looks like anything else. It does get better. It will not look exactly the way it did before, and we do the best we can with it.
Parking, and the neighbor you cannot control
Subcontractors park on the street, the same as any visitor to your house. On a busy week that might be several vehicles.
Most of the time nobody minds. Occasionally somebody does. On a recent basement finish the neighbors across the street were unhappy about the project generally, the dumpster specifically, and the sound of material going into it. Our framing subcontractor parked in front of their house and got cussed out for it. They then called another neighbor who sat on the city council, who came over, and we talked it through. It turned out to be nothing. Nothing was in breach of any code and the job carried on.
My read on that is simple. Some neighbors are going to be like that and it is rarely about you. We do not antagonize anybody on purpose, we move vehicles when somebody asks, and beyond that the best anybody can do is be a human about it. People get cranky and everybody has a bad day.
If you have a neighbor you already know will struggle with this, tell me at the start. A heads up before the dumpster lands costs nothing and takes most of the heat out of it.
What to ask before work starts
Ask where the dumpster is going and who is ordering it. Ask what happens if equipment marks the driveway, and listen for whether the answer puts that cost on you.
Ask when material is being ordered relative to each phase, which tells you whether your driveway is a delivery point or a storage yard. If the project touches the ground at all, settle the yard restoration question in writing before the first contract.
If you are weighing whether to stay in the house while all of this is going on, living in your house during a remodel is the longer answer. For what is happening on the inside at the same time, how much dust a remodel actually makes covers the containment side, and how to prepare your home before a remodel starts covers what to move before day one. For addition pricing specifically, see a realistic budget for a home addition. To talk about a project in Cache Valley or Box Elder County, request an estimate.