Whole Home Remodel โ Providence, Utah
A 1979 house taken apart one level at a time. We finished the basement first so the family had somewhere to live, then gutted the main floor over their heads.
5 bed, 3 bath
This one ran eight months and took the house apart a level at a time. We finished the basement first so the family had somewhere to live, then gutted the main floor over their heads.
What We Found
A 1979 house. The owners had given it a cosmetic remodel when they moved in around 2017 โ paint, flooring, that kind of thing โ and the bathroom vanities had been replaced not long before we arrived. Underneath the cosmetics it was still a 1979 house, and it was squeaky underfoot on both levels.
The Basement, First
We changed the layout rather than working around it. New partition walls, a bedroom added to the two already down there, and the stairway reframed to run the opposite direction โ that one decision is what made the rest of the floor plan work. Then a full kitchen with white shaker cabinets and quartz counters, a new laundry room with proper cabinets, and built-in shelving.
By the end of June it was finished and the homeowners moved down into it.
Then The Upstairs
The week after they moved down, we opened the main floor. Walls came out of the center of the house to make it one room. New electrical throughout, new plumbing in both kitchens, the laundry relocated, and both furnaces replaced.
The kitchen went charcoal with a quartz waterfall island and seating, across from a built-in wall with a linear fireplace. New stair railing, board and batten, a new front door and a new door on the garage side.
The Squeaky Floor
The floor moved everywhere you stepped, which is not what you expect from a 1979 house. When we opened it up we found out why. The subfloor was held down with staples and smooth-shank nails and no adhesive at all. Nothing was ever going to hold that still.
We replaced it the way it should have gone down in the first place โ adhesive, the right fasteners, real blocking. It has been quiet since.
The Master Bathroom
The master bathroom was decided on partway through the upstairs, and it is the best room in the house now. We took the space out of the master bedroom to make it work: new plumbing, a tub added, a double vanity, a full eight-foot closet, and an engineered marble shower at roughly twice the footprint of the old one.
The other two bathrooms were left alone.
The Flood
About a week after the basement was finished and the family had moved into it, a supply line at a vanity let go overnight โ a Saturday into a Sunday โ and flooded the whole thing.
It was not our work and not a room we had touched. That vanity had been put in by someone else not long before we got there, and a piece of pipe had been cut short enough that the connection was under strain from the day it went in. It finally gave.
Their insurance brought in a remediation contractor to redo the flooring, drywall, paint and baseboards down there while we kept working upstairs. The homeowners handled it with more grace than I would have in their position. The job was already long, they had finally moved into their new space, and it went under water in a night.
Where It Landed
Five bedrooms and two kitchens across both levels, a master bathroom rebuilt from scratch, and eight months from the first day to the last. Finished in December 2025.
Start To Finish
Before — the basement as we found it
Before — original basement living area
Demolition begins
Back to the original framing
Stripped to concrete
New partition walls, new layout
Framing the added bedroom
The stairway reframed to run the other way
Mechanical room and framing
Drywall hung
Built-in shelving framed in
Basement kitchen cabinets going in
White shaker and quartz, finished
The finished basement kitchen
Island and pantry
French doors into the basement
The new basement laundry room
Upstairs, back to studs
Center walls out
Subfloor up, joists exposed
New subfloor going down
Adhesive, proper fasteners, blocking
Framing and a skylight opening
The built-in wall framed out
Electrical and plumbing rough-in
Built-in wall drywalled
Taped and textured
New front door
One room, before finishes
Charcoal cabinets set
The built-in wall, finished
New stair railing
Board and batten
New door, garage side
Appliances in
The fireplace running
Quartz waterfall island
Backsplash and faucet
The master bathroom tub
Double vanity and the new closet
The finished kitchen
Kitchen through to the living room
Finished living roomPlanning Something This Size?
Tell us what you are trying to change. We will confirm the permit path for your address and give you a real range before anyone talks about a contract.