How We Work

Our Process, Start To Finish

What happens from the first message to the end of your one-year warranty — who is involved at each stage, what you receive, and what it costs.

How We Work

No Mysteries In The Middle

A remodel goes well or badly largely on the strength of its process — whether decisions get made in advance, whether costs are understood early, and whether everyone knows what is happening next week. Ours is written down, start to finish, so you can hold us to it.

Step By Step

How A Project Actually Runs

Six stages, from the first message to a signed proposal. Each one is there for a reason, and you will always know which stage you are in.

1 · You Get In Touch

Fill in the form or pick up the phone — either works. All we need at this stage is a rough idea of what you are thinking about doing and when you would like it done.

2 · The Project Call

This is the real conversation, and it is not a sales pitch. We want to understand why you are doing this and why now. What is not working about the space today. What you picture when you imagine it finished. Who else has a say — a spouse, a parent, a business partner, anyone whose input will shape a decision later. When you would like to be finished. And what you are hoping for from a contractor, because that tells us a great deal about how the project should be run.

By the end of that call we will both have a clear sense of whether this is a good fit.

3 · Rough Numbers, On That Same Call

Before going further, we want to be in the same range on budget. We will walk you through what comparable projects have actually cost and give you a working ballpark.

It is a starting point rather than a quote. It comes from projects that sound like yours rather than from your house, so it can move once we have seen the space. Its job is simply to tell us both early whether we are aligned, so the time we spend together goes into the things that matter.

4 · The On-Site Consultation — $500

If the ballpark works for both of us, we come out. This is a paid consultation at $500, credited in full against your project when you build with us.

We ask that everyone with a say is there. We walk the space together and work through scope, what is feasible, what it takes structurally, whether engineering is involved, your timing, and how you want it to look and feel.

Then we document it properly: extensive photographs and a full 3D scan of the space, which gives us an accurate model to design against and lets us produce real 2D plans rather than sketches.

5 · What You Get Back

Back at the office we turn all of that into something you can hold:

  • Visualization images, so you can see the space the way we have been describing it
  • 2D plans drawn from the scan
  • A detailed scope sheet — what we are doing, how we are doing it, why, and in what sequence
  • The proposal: the scope line by line, and one number at the end

The scope is itemized so you can see exactly what is included. The price is a single number for the whole project, which keeps the conversation on what you want rather than on how a spreadsheet is divided up.

6 · Then We Work On It Together

The proposal is a starting point, not a final answer. This is a collaboration, and if the number is higher than you were hoping for, we work on it together — adjusting scope, reconsidering finishes, or phasing the work over time. There is almost always a version of the project that fits.

What stays constant is how the work itself gets built. We are glad to take items out of a scope or move to a different finish alongside you, and whatever remains in the project gets built properly. That way what you end up with is something we are both happy to put our name on.

After You Sign

From Contract To The Final Check-In

What happens between signing and the end of your warranty. We would rather you knew all of it before you commit to anything.

7 · Signing, Deposit And Permits

When you sign, we collect a 50% deposit. That is what lets us hold your place on the schedule, book subcontractors and begin ordering materials — commitments made well before anyone starts work at your house.

Because the scope and the plans are already finished, we can normally submit for permits within a few days, a week at the outside, assuming any required engineering is in hand. Permits go to whichever municipality you fall under, and we will tell you what their review times are running at when we submit.

8 · Scheduling And Materials

Subcontractors get booked and materials get ordered. Not everything at once — for some items just-in-time delivery works better than having them sit in a garage for six weeks. Long-lead items such as cabinets go early, and other things arrive as they are needed.

Once permits clear you have a start date, and if the project runs in phases, the sequence those phases will follow.

9 · The Pre-Construction Walkthrough

Before anything starts we sit down together and walk the project one more time. This meeting is about expectations rather than design.

We go through what is going to happen, when, and who will be in your house doing it. We will also walk you through what the hardest days of the project look like, because knowing that in advance makes them far easier to live with. Then we cover how we handle the things that come up along the way, and how we keep the job moving.

10 · During The Build

You will know who is on your project and what they are there to do. You get a written update every week with photos, and a call the same day when something needs a decision. Some weeks there is genuinely little to report, but you should never be left wondering what is happening inside your own house.

Payments follow a progress schedule agreed before we start, so you always know what is coming and when.

11 · Substantial Completion And The Blue-Tape Walkthrough

At substantial completion we walk the whole project together with blue tape and mark everything — anything not right, not finished, or not to the standard we agreed. The aim is that everything which can be put right is put right now.

We work through that list, and then there is one final payment, typically around $5,000. It is deliberately small compared with the payments before it, which keeps those last details firmly our responsibility to finish well.

12 · The Warranty Meeting

Once the punch list is closed we meet again. We sign off the remaining construction documents and close the project out properly, and then we walk you through the warranty.

You get a one-year workmanship warranty, running from the day those final documents are signed. It covers labor — anything we built that should have been done better. Materials are covered by their own manufacturers, and part of this meeting is making sure you hold those warranties and know exactly who to contact.

It also transfers. If you sell the house part way through that year, the new owner keeps whatever coverage is left on the work we did.

13 · A Year Of Check-Ins

We come back at 30 days, six months and twelve months. A couple of months before the year runs out we check in one final time and, where we can, come by to look at the work in person.

We try to visit at the earlier check-ins too. That is not always possible, but the calls always happen.

Being Straight With You

Why The Consultation Is Paid

Many remodeling companies will come out for free. We do not, and we would rather you knew that before you call than after.

Estimating a project well takes real time — driving out, measuring, scanning, drawing, and writing a scope careful enough to build from. Companies that give that away still have to cover the cost of it, and it generally ends up inside the price of the jobs that do go ahead. We would rather charge for the work directly and keep our pricing straightforward.

It also changes what you receive. The $500 buys a full 3D scan of your space, real 2D plans, visualization images, and a scope document detailed enough to build from — and that work is yours to keep either way. If you build with us, it comes off the project in full.

If you are early on and gathering free quotes to compare, we are probably not the right fit just yet, and we would rather say so now than take up an afternoon of your time.

Questions

What People Ask About This

No. The project call comes first and costs nothing. We only talk about an on-site consultation once we have both decided the project makes sense and we are roughly aligned on budget. Plenty of calls end without one, and that is a perfectly good outcome.

They are yours. The 3D scan, the 2D plans, the visualizations and the scope sheet are what the consultation produces, and you keep all of it. You are welcome to take that scope to another contractor — it will make their number more accurate too.

Because the decisions made on that visit shape the whole project. When someone with a say is not in the room, choices tend to get revisited a couple of weeks later based on second-hand information, and that costs everyone time. Having everyone there once is far easier than having the conversation three times.

No, and we will say so at the time. It comes from projects we have actually built that sound like yours, which makes it useful for deciding whether to keep talking and unsuitable as a commitment. The real number comes after we have seen the house and written the scope.

The scope is line by line — you will see every item we are doing. The price is one number for the whole project.

A remodel is priced as a system rather than as a list of parts, because the parts depend on each other. Pricing it as one number keeps the conversation on what you actually want, rather than on how a total is divided up. You get full detail on what we are building, and one number for building it.

Then we sit down and work on it together. Sometimes the project grows between the call and the walkthrough. Sometimes we read it differently once we are standing in the space. Either way the answer is the same: look at scope and finishes together and find the version that fits, rather than quietly reducing quality to hit a number.

We will tell you, and we will tell you early. It is far better to pause in the first week than to be six weeks into a project that was not right from the start. We would ask the same of you — if at any point it does not feel right, say so and we will stop and talk it through.

Because it is not profit, it is commitment. Signing means booking subcontractors into a calendar and ordering materials, both of which are real financial commitments made weeks before anyone starts work at your house. The remaining payments follow a progress schedule agreed before we begin, and the final one is deliberately small.

Workmanship. If something we built was not done as it should have been, we come back and put it right. It runs from the day the final construction documents are signed.

Materials are covered by their manufacturers rather than by us — a failed appliance or a defective slab is a manufacturer claim. We make sure you hold those warranties and know who to call.

It transfers with the house. Sell part way through the year and the new owner keeps whatever coverage is left on the work we did. There is nothing to apply for.