How Much Does a Bathroom Remodel Cost in Providence, Utah? (2025 Pricing Guide)
- Mycka Koger
- Nov 18, 2025
- 4 min read
Bathroom remodels remain one of the most popular upgrades for homeowners in Providence and throughout Cache Valley. A well-designed bathroom adds comfort, functionality, and long-term value to your home. Updated bathrooms also help homes in Providence, Logan, North Logan, and Nibley sell faster and for higher prices.
But how much does a bathroom remodel actually cost in 2025? The answer depends on the size of your bathroom, the materials you choose, and whether you’re changing the layout. Below is a breakdown of realistic pricing based on current labor and material costs in Northern Utah.

Average Cost of a Bathroom Remodel in Providence
On average, a bathroom remodel in Providence ranges from:
$12,000 – $45,000+
Typical ranges:
Small hall bathroom: $12,000–$18,000
Mid-size bathroom: $17,000–$28,000
Master bathroom: $25,000–$45,000+
Full layout change or high-end remodel: $40,000–$70,000+
Bathroom remodel pricing in Providence is similar to Logan and North Logan, but usually a bit lower than Salt Lake County and Utah County markets.
Cost Breakdown: Where the Money Goes
Below is a realistic breakdown of where your remodeling budget is allocated during a typical Providence bathroom renovation.
1. Demolition and Disposal
$800 – $2,000
Removing old flooring, tile, drywall, vanities, and tubs is the first stage of the project. Costs vary depending on:
How much tile removal is required
Whether the tub or shower needs to be removed
The amount of disposal needed
Whether hidden issues like rot or mold are discovered
Older Cache Valley homes often have moisture damage behind older tile surrounds, especially if they were built between 1970 and 2000.
2. Plumbing and Electrical
$1,500 – $6,000
If your remodel keeps the same layout, the cost stays near the lower end. Moving plumbing fixtures increases the budget due to new drain, supply, and venting requirements.
Common upgrades include:
Replacing shower valves
Adding recessed lighting
Updating vent fans
Installing outlets for mirrors or bidets
Replacing old PEX or copper lines
Licensed trades in Cache Valley are in high demand, which affects pricing more than national averages suggest.
3. Shower or Tub/Shower Combo
$2,500 – $12,000+
A tub/shower combo is the most affordable option, while a fully tiled shower adds more cost but significantly elevates the look and value of the bathroom.
Typical ranges:
Prefabricated fiberglass tub/shower: $2,000–$4,000
Fully tiled shower: $6,000–$12,000+
Cost depends heavily on tile type, shower size, niche count, waterproofing system, and the style of shower glass you choose.
4. Flooring
$500 – $2,000
Most homeowners choose between:
LVP (waterproof)
Ceramic tile
Porcelain tile
Tile floors add cost due to labor, while LVP is a budget-friendly and durable option.
5. Vanity, Countertops, and Storage
$1,200 – $6,000
This includes the vanity cabinet, countertop, sink, faucet, and any additional storage such as linen towers or floating shelves.
Quartz countertops remain the most popular option in Providence due to their durability and low maintenance.
6. Toilet, Fixtures, and Accessories
$500 – $2,000
This category includes the toilet, faucet, shower fixtures, accessories, and mirrors. The cost depends on the brand, finish, and style.
7. Paint, Trim, and Finishing Work
$600 – $2,000
This includes painting, baseboards, door trim, caulking, sealing, and general finishing work. Many older Providence homes require trim adjustments or replacement, which can increase cost slightly.
Factors That Affect Bathroom Remodel Cost in Providence
The following factors have the greatest impact on your remodel budget.
1. Layout Changes
Moving the shower, toilet, or vanity dramatically increases plumbing and electrical costs. Keeping fixtures in the same location is the best way to stay on budget.
2. Tile Selection
Tile choice has a major impact on pricing. Larger tiles, patterned tiles, and natural stone require more labor and often cost more per square foot.
3. Age of the Home
Older homes in Providence may require:
Subfloor repairs
New plumbing runs
Updated electrical
Proper waterproofing systems
These factors can increase both cost and project duration.
4. Shower Design
Curbless showers, custom benches, multiple niches, and linear drains increase labor time and material cost.
5. Material Lead Times
Some materials have extended lead times that can affect the project timeline. Salt to Summit helps homeowners select and order materials early to avoid delays.
How to Budget for a Bathroom Remodel
Here are some effective ways to plan your budget:
Prioritize your must-haves first
Plan for a 10–15 percent contingency
Determine what can be reused
Choose materials early to avoid delays
Stick to your original layout if possible
Planning ahead is the best way to keep your remodel smooth and on budget.
How Long Does a Bathroom Remodel Take in Providence?
Most bathroom remodels take 2–5 weeks, depending on the scope.
Simple updates typically take 10–12 days, while full tile showers, layout changes, and glass installations extend the timeline to several weeks.
Why Bathroom Remodels Are a Good Investment in Providence
Bathroom remodels consistently rank among the highest return-on-investment projects for homeowners in Cache Valley. Updated bathrooms improve functionality, increase resale value, and elevate the overall appeal of your home.
A well-designed bathroom also enhances daily comfort, which is one of the biggest long-term benefits for homeowners.
If you’re planning a bathroom remodel in Providence or anywhere in Cache Valley, Salt to Summit Construction can provide a quick ballpark estimate to help you get started.




