Logan Utah Whole-Home Remodel Timeline (2025 Guide): How Long Does a Full Renovation Really Take?)
- Mycka Koger
- Dec 2, 2025
- 3 min read
Planning a whole home remodel in Logan, Utah is one of the best ways to update an older layout, improve comfort, and add long-term value to your property. Homes built between the 1980s and early 2000s make up a large portion of Logan’s housing stock, and many are now due for modern layouts, new flooring, updated kitchens, refreshed bathrooms, and better lighting and storage.
This 2025 guide breaks down realistic timelines, what affects the schedule the most, and how Logan homeowners can plan for a smooth remodel from start to finish.

Understanding Whole Home Remodel Timelines in Logan
Every remodel moves at a different pace depending on scope, square footage, material selections, structural changes, and the age of the home. The timelines below reflect safe, conservative ranges based on recent whole home remodels completed in Logan and surrounding Cache Valley neighborhoods.
Light to Moderate Whole Home Remodel
Timeline: 8–12 weeks
This tier focuses on refreshing the home without major layout changes or structural work. It is common in Logan homes that still have good bones but need cosmetic updating.
Typical scope includes:
New LVP, carpet, or hardwood in key areas
Interior painting throughout
Updated baseboards, doors, and trim
Minor electrical upgrades and new lighting
Small layout adjustments that don’t involve structural changes
General finish carpentry
Even with a simpler scope, scheduling subcontractors, ordering materials, and working room-by-room often pushes the project into a realistic 8–12 week window.
Mid-Range Whole Home Remodel
Timeline: 12–20 weeks
Most full remodels in Logan fall into this category, especially homes from the 1990s to early 2000s. This level typically includes at least one kitchen remodel, one or more bathrooms, flooring throughout, and layout adjustments.
Typical scope includes:
Kitchen remodel with new layout or cabinets
One or two bathroom remodels
Flooring throughout the main level
New doors, trim, and hardware
Plumbing and electrical improvements
Partial wall removals or layout corrections
Tile work in wet areas
Moderate finish carpentry improvements
The combination of tile, plumbing relocation, cabinet lead times, and inspections makes this the most common timeline range for Logan homeowners.
Major Renovation or Full Layout Reconfiguration
Timeline: 4–6+ months
This tier is appropriate for older Logan homes (1970s–1990s) needing modernization from top to bottom. Projects that involve engineering, extensive demolition, multiple wet-space remodels, or full redesigns naturally extend the schedule.
Typical scope includes:
Removing load-bearing walls
Engineering and framing corrections
Full kitchen remodels and multiple bathrooms
Significant plumbing or electrical rewiring
New windows and exterior doors
Custom cabinetry and millwork
Reconfiguring entire floor plans
Structural tie-ins and reinforcement
These remodels require more coordination with city inspections, specialized subcontractors, and long-lead materials, which is why a 4–6 month estimate is realistic and allows you to under-promise and over-deliver.
What Affects Remodel Timelines in Logan, Utah?
1. Age and Condition of the Home
Homes in Logan built from the 1970s–2000s sometimes reveal:
Electrical issues
Subfloor repairs
Plumbing corrections
Insulation upgrades
Structural surprises during demo
Unforeseen conditions are the most common source of delays.
2. Kitchen and Bathroom Scope
Wet spaces drive a large portion of the timeline because of:
Tile work
Plumbing changes
Cabinet fabrication
Countertop lead times
Multi-stage inspections
Even one large kitchen can affect the timeline by several weeks.
3. Structural Changes
Removing walls, adding beams, and redesigning layouts triggers:
Engineering review
City approvals
Longer framing stages
Additional inspections
These steps increase both complexity and timeline.
4. Material Selections
Choosing materials early keeps the project moving. Delays often occur with:
Tile
Custom cabinets
Special-order fixtures
Premium flooring
Countertops
Logan homeowners benefit most when selections are finalized before demo.
5. Seasonal Scheduling in Cache Valley
Winter remodels may require:
Temporary heating
Adjusted material delivery schedules
Weather protection around entrances
These factors rarely add major time, but they can shift scheduling by a few days or weeks.
How to Prepare for a Whole Home Remodel in Logan
1. Plan Your Material Selections Early
Ordering ahead avoids delays and keeps the project flowing smoothly.
2. Identify Areas That Must Remain Functional
Many Logan homeowners create temporary setups for:
Kitchens
Bathrooms
Work-from-home spaces
Early planning makes the remodel process easier.
3. Discuss Budget and Scope Upfront
Clear expectations help avoid unexpected changes or timeline adjustments.
4. Work With a Licensed Northern Utah Contractor
Choosing a qualified contractor ensures:
Coordination with the city of Logan
Proper permitting
Clear communication
Accurate scheduling
Warranty protection
This becomes even more important on full-home renovations.
Serving Logan & All of Cache Valley
Salt to Summit Construction & Renovation regularly completes full-home remodels in Logan, North Logan, Providence, Hyde Park, Nibley, Smithfield, and nearby communities. Our approach focuses on clear communication, quality craftsmanship, and realistic timelines that help homeowners plan confidently.
Ready to Talk About Your Logan Home Remodel?
If you're planning a remodel, we’d be happy to discuss your goals, budget, and timeline.